Most of my goals this month were carried over from last month.
This is what I hope to work on this month:
- Finish quilting the border on the large twister quilt and bind it
- Quilt and bind the green/yellow swoon Quilt- would like to gift at the end of this month
- Bind the pink/yellow floral quilt
- Bind the monkey tumbler quilt
- Quilt the town square quilt
- Quilt the grey zig zag baby quilt
This list is way more than I can get done this month. As I look at my list, I notice there isn't any piecing on it. I may have to change that. A month without piecing would be very lonely.
1 comment:
I'm sure that you can get a couple of things on that list finished. Good luck with the ball park!
Post a Comment